What we Delivered

Crown Charter School
12450 West Maryland

Litchfield Park, Az 85340

 

Goal: Remove source of intense sound harmonics and duct rumble. Using required tonnages, created design and layout plans to replace rooftop HVAC units (2 yrs old), along with main duct distribution with split systems and new ductwork.

  • Disconnected and removed two(2) of the existing 10 ton package heat pumps
  • Installed new split systems and duct. (9)
  • Completed within 30 days before school started.

JITC

Ft Huachuca Az

Goal: Modular raised floor computer lab

  • Worked with ESB modular and ManTech to build a modular raised floor lab
  • Installed ducting for 8 ten ton units
  • Design had to fit the limited space requirements and still perform within manufacturers specifications.
  • Resulted in no loss of performance and no increase in noise levels.

 

 

                  

Golden Arrow General Contractor

El Capitan Court

North Park Avenue,

Tucson Az



Goal: Renovate a circa 1920’s 10 unit UA area apartment facility with all new HVAC systems.

  • Worked closely with general contractor on up-front budget analysis to save costs without sacrificing the integrity of the project
  • Installed new duct systems and registers in old plaster ceilings.

 

Agave Homes

Camino Cantil

Custom home Pima county Az

Goal: Install custom duct system in new home using spiral pipe and linear slot diffusers.

  • Used extremely limited amounts of flexible ducting.
  • No internally lined ductwork. No exposed fiberglass surfaces in air stream.
  • All duct work externally lined with a minimum of R-8 insulation.
  • All ductwork joints sealed with mastic.

 

Birchard Remodeling

Volk residence

El Encanto remodel

Goal: Install custom duct system and evaporative cooling in 1930's home using hard duct 

  • Used extremely limited amounts of flexible ducting.
  • No internally lined ductwork. No exposed fiberglass surfaces in air stream.
  • All duct work externally lined with a minimum of R-6 insulation.
  • All ductwork joints sealed with mastic.
  • register placements specified by owner/decorator CJ Volk.
  • Home featured in Tucson magazine.CJ is a very gifted designer, I have worked in other top Tucson designers homes and CJ is in my opinion the most talented I have seen.
  • This is a before remodel picture

 

Mr Steve Hawley

Historic Wilcox area ranch house

Dos Cabezas Az

Goal: Install custom duct system and evaporative cooling in 1920's ranch house using hard duct and spiral pipe.

 

Mr Jim Smith

residence

Tucson Az

Goal: Install custom duct system and re-use existing heat pumps while adding approximately 600 sq ft to home.

 

  • No internally lined ductwork. No exposed fiberglass surfaces in air stream.
  • All duct work externally lined with a minimum of R-6 insulation.
  • All ductwork joints sealed with mastic.
  • used all hard duct and spiral pipe.
  • No flexible ducting
  • All duct work installed in conditioned space.

 

ESB Modular

Bus station

Tucson Az

Goal: Relocate Greyhound bus station to temporary location to facilitate the remodeling of the old train station and down town intersections on 4th avenue.

 

 

 

duct in conditioned space
Ranch house
Volk residence
spiral_custom home
El capitan

Agave Homes
Wyatt Earp museum

Tombstone Az.

Goal: Transform an historic existing adobe building (circa 1815) into one with air conditioning. Considered to be Wyatt Earp’s residence in Tombstone.

  • Installed registers in frail plaster ceilings and ductwork and sheet metal for HVAC system in attic.
  • Worked closely with general contractor to design and build the project considering the delicate materials.
Earp
crown
ufad
Greyhound bus station
culinary arts

ESB Modular

Mountain View High School, Culinary arts building

Marana Az

Goal: Incorporate 6 commercial grade grease hoods and 10 heat pump systems and make up air systems into 9000 sq ft modular building housing classrooms for Tucsons future chef's.

 

 

 

              

 

 

 

                                                                                